Working Hours: 45 Hours/Week (Head office assignment)
Assignment duration: ASAP upto 4 months.
Job Description
Electrical engineer should have experience of Detailed Engineering of electrical deliverables listed below:
- Preparation of Cable Routing Layouts
- Preparation of Grounding Layouts
- Preparation of Lighting Layouts
- Prepare BQ and extract BQ quantities of power and control cables, lighting cables, termination of power and cable cables. Lighting poles, junction boxes.
- Prepare Mark Ups drawings for cable routing, lighting input and grounding input on layouts.
- Prepare CVL Input for cable trenches, street lighting poles foundation, transformer foundations.
- Prepare CVL input for cable entries in substation.
Electrical engineer must be familiar and capable to work on above listed detailed engineering activities and his assignment is not limited to above activities.